General

Larsen & Toubro Rise On Hopes Of Contract For Bullet Train Project

NewsGram Desk

Shares of Larsen & Toubro (L&T) rose over three percent in the hopes of bagging the contract for constructing the 237 km length of the bullet train project under the Mumbai-Ahmedabad high-speed rail corridor.

The engineering and infrastructure major has emerged as the lowest bidder for constructing the bullet train project.

The contract for constructing the 237 km length of the bullet train project. Flickr

The financial bids for the design and construction of 237 km length of the viaduct for 508 km of Mumbai-Ahmedabad high-speed rail corridor were opened on Monday and Larsen and Toubro emerged as the lowest bidder, said a statement from the Indian Railway.

On Tuesday, shares of L&T surged 3.6 percent on the BSE to touch an intra-day high of Rs 935.60 per share.

At 9.43 a.m., its share price was at Rs 927.55, higher by Rs 24.55 or 2.72 percent from its previous close. (IANS)

Rollover Accidents Involving SUVs: Why Are They So Common?

10 Ways to Drive Customer Engagement with Interactive Mobile App Features

How to Store Vape Juice in Good Condition

Book Your Airport Taxi Limo Service Today for a Smooth and Stylish Arrival

American Children Who Appear to Recall Past-Life Memories Grow Up to Be Well-Adjusted Adults